We Continue the Work of Those
Who Were the First.

  • Electrotechnics
  • Electrical Engineering
  • Light & Lighting
  • Power Engineering
  • Transportation
  • Automation
  • Communication
  • Smart Buildings
  • Industry
  • Innovation

Current issue

ELEKTRO 12/2021 was released on December 1st 2021. Its digital version will be available immediately.

Topic: Measurement, testing, quality care

Market, trade, business
What to keep in mind when changing energy providers

SVĚTLO (Light) 6/2021 was released 11.29.2021. Its digital version will be available immediately.

Fairs and exhibitions
Designblok, Prague International Design Festival 2021
Journal Světlo Competition about the best exhibit in branch of light and lighting at FOR ARCH and FOR INTERIOR fair

Professional literature
The new date format for luminaires description

Russia launches a new space telescope

15. 7. 2019 | Phys.org | www.phys.org

Russia launched a space telescope Spektr-R from the cosmodrome in Baikonur, Kazakhstan, in a joint mission with Germany intended to map X-rays across the sky and replace a project lost in January.

The launch of the scope, weighing more than 2.7 tonnes, was originally scheduled for June 21 but was postponed twice because of a battery problem. The Spektr-RG, developed with Germany, is a space observatory intended to replace the Spektr-R, known as the "Russian Hubble", which Roskosmos said it lost control of in January.

Space telescope

The telescope's research mission is set to last for six-and-a-half years including a four-year scan of the heavens and the remainder spent observing objects in space "at the behest of the international scientific community," the agency statement said. It will take some three months to reach its destination, an observing position some 1.5 million kilometres (900,000 miles) above Earth.

Read more at Phys.org

Image Credit: Roskosmos

-jk